| METHODS OF INSTALLATION OF CAPACITORS FOR POWER FACTOR IMPROVEMENT |
UTILITY-E/M |
4.39 |
|
METHODS OF INSTALLATION OF CAPACITORS FOR POWER FACTOR IMPROVEMENT
|
| FIRE FIGHTING PUMPS, INSTALATION & MAINTENANCE |
UTILITY-E/M |
11.23 |
|
FIRE FIGHTING PUMPS, INSTALATION & MAINTENANCE
|
| DIESEL GENERATOR PARTS & THEIR FUNCTION |
UTILITY-E/M |
8.32 |
|
DIESEL GENERATOR PARTS & THEIR FUNCTION
|
| LIGHTNING PROTECTION |
UTILITY-E/M |
6.59 |
|
LIGHTNING PROTECTION
|
| BUSBAR TRINKING SYSTEM AND ITS COMPONENTS |
UTILITY-E/M |
9.47 |
|
BUSBAR TRINKING SYSTEM AND ITS COMPONENTS
|
| FUNCTIONING OF MBBR OF TECHNOLOGY SEWAGE TREATMENT PLANT |
UTILITY-SEWAGE |
13.45 |
|
FUNCTIONING OF MBBR OF TECHNOLOGY SEWAGE TREATMENT PLANT
|
| REFRIGERATION & AIR CONDITIONING, TYPES, PLANNING AND MANAGEMENT OF OPS |
UTILITY-E/M |
13.28 |
|
REFRIGERATION & AIR CONDITIONING, TYPES, PLANNING AND MANAGEMENT OF OPS
|
| POWER QUALITY INTRODUCTION |
UTILITY-E/M |
8.1 |
|
POWER QUALITY INTRODUCTION
|
| UTILITY E&M PIPES |
UTILITY-E/M |
9.47 |
|
UTILITY E&M PIPES
|
| SOIL SLABILIZATION TECHNIQES WITH PREFABRICATED VERTICAL DRAIN |
PLANNING AND DESIGN |
10:12 |
|
SOIL SLABILIZATION TECHNIQES WITH PREFABRICATED VERTICAL DRAIN
|